Sewage Pump At The Sewage Treatment Plant
Application of sewage heat pump technology sewage pump to Miyun Sewage PlantAbstract: Miyun County shopping bags , Tan Zhou Sewage Treatment Works project to introduce the Nordic heat pump advanced technology and equipment replica watches , use of untreated urban sewage as a source of water source heat pump technology rayban sunglass , has a low energy water through the heat exchanger ralph lauren polo shirts and heat pump into a high energy for heating, cooling wholesale evisu jeans , domestic hot water supply.
Keywords: Heat pump water economy Abstract: The sewageheatpump project of Miyunsewageplant buy moncler , introduced the Northern Europe advanced technology andequipment christian louboutin .Adopting the municipal sewage without any treatment asheatsource and heatsinkis tory burch flats the innovative technic that can transferthe lowtemperature energy of sewagewater to hightemperature energythrough lacoste shirts heatpump system for heating, airconditioning and hotwatersupply.
Keyword: sewage heatexchange heat pump economical efficiencyI ralph lauren shirts . Project Description: Miyun County, Tan Zhou sewage treatment plant is located in the beautiful Chaobai River moncler vest , is the only water in Miyun county focus point undertake daily Miyun county near 24000m3 of sewage disposal. Effluent quality and stability, year-round temperature of 13oC-15oC moncler outlet . About 10000m2 factory buildings (offices, factories shoes manufacturers , garages, etc.), use of untreated urban sewage plant for the heat source for heating and some cooling (only the building needs cooling), and also for domestic hot water use chaussures puma . It is time to water heating for the heat to water in the cooling time for the heat exchange.
As the supply of adequate sewage treatment plant effluent nfl jerseys , emissions of heat extraction and to meet the heating and cooling needs jordan sneakers .The project is sewage treatment plant in Miyun County blue jeans , Tan Zhou original coal-fired boiler room renovation project. The original coal-fired boilers cause some air pollution each year wholesale handbags , to meet the needs of environmental protection in Beijing, decided to transform this heating system air jordan xx3 , no longer use coal, so using both heating and cooling water can source heat pump system nike shox . Sewage treatment plant is divided into two parts, is the transformation of office buildings cheap jordan shoes , the other is the transformation of plant equipment, the installation of office to be able to heat the fan coil cooling system wholesale jordans , factory installed equipment is a better heat dissipation Steel string-type radiator.
2, system theory and design Winter nike air max 2009 , water temperature is about 12-15 through the heat exchanger after the exhaust temperature is about 7-10 cheap jordans , the system extracts heat from sewage water source heat pump unit as a low-temperature heat source into the heat pump evaporator working lights , heat pump condensing submerged as a circulating water heating systems, supply and return water temperature is 50-45 microscope digital . In summer, water temperature is about 14-18 after heat exchanger discharge temperature after the 19-23 , the sewage system, the heat away as the cooling water source heat pump unit when the cooling water p90x workout , heat pump water as a cooling evaporator system of circulating water, supply and return water temperature is 7-12 .
The heat pump with heat recovery function to run in the winter and summer conditions thermal imaging camera , while ensuring the supply of hot water.User side through the sub-catchment water supply device for each floor of each monomer lithium batteries . System in winter and summer conditions of the conversion system in the station house by switching the valve to achieve cheap air force one .System design: 1, heating and air conditioning design parameters:Winter outdoor air temperature for -12Winter indoor design temperature 18-24 Outdoor air temperature for the summer: 33.2 ; wet bulb temperature: 27.3Summer design temperature 22-26 room air conditioning2 indoor play equipment , load calculation: Estimate the complex building heating index was 60w/m2Total design heating and cooling an area of 10000m2.

January 2011